Blackfriars station will be completely rebuilt and the office building above it demolished and replaced. The LUL station at Blackfriars will close for 24 months [1].
After the closure of the existing terminus platforms in March 2009, the through platforms will be extended along Blackfriars Railway Bridge over the River Thames to accommodate 12-car trains (in place of eight today). The platform layout will be altered such that the through platforms will be on the east side of the station (currently the west side), and the terminus platforms on the west side (currently the east side) [2]. This means trains to and from London Bridge will no longer have to cross the lines that lead to the terminus platforms.
The works will involve making use of the disused piers which lie west of the existing railway bridge. The number of terminating platforms will be reduced from three to two in the process, but some terminating services will become through services, and the increased length will allow longer trains to terminate at Blackfriars. In addition there will be an additional station entrance on the South Bank and the ticket offices for National Rail and LUL services will be combined.[2]
After the closure of the existing terminus platforms in March 2009, the through platforms will be extended along Blackfriars Railway Bridge over the River Thames to accommodate 12-car trains (in place of eight today). The platform layout will be altered such that the through platforms will be on the east side of the station (currently the west side), and the terminus platforms on the west side (currently the east side) [2]. This means trains to and from London Bridge will no longer have to cross the lines that lead to the terminus platforms.
The works will involve making use of the disused piers which lie west of the existing railway bridge. The number of terminating platforms will be reduced from three to two in the process, but some terminating services will become through services, and the increased length will allow longer trains to terminate at Blackfriars. In addition there will be an additional station entrance on the South Bank and the ticket offices for National Rail and LUL services will be combined.[2]