Well that was really interesting. There are 4 pitches being built on 2 tiers. As the ground was very uneven, a 6 metre slope from top to bottom of the land, it had to be evened out before any work could start on prepping the pitches
Pitch 1 is going to be stadium grade, the same as the pitch on the new stadium so the players can train on the same grade pitch as they will play on.
It has a 450mm depth with all new material, top layer using fibre in sand with a strong root zone. Seeding has taken place and should start to show green by xmas full drainage as clay. The sand topping means it drains easily and has an automated irrigation system can be run via smartphone
There will be a 3000 m3 underground water collection tank for rainfall that can be used to water the pitches to save on water.
Pitches 2 and 3 are slightly lower grade but still have the same irrigation system and built on new materials
Pitch 4 is built on current materials so no new soil etc was used. It will be used for academy training and will be hired out which will generate revenue. There is a possibility it may be converted to 3G at some point.
The chap leading the build on the pitches was very knowledgeable in all things soil and answered everyone's questions
Car Park and changing rooms to be built
Had a good chat with Tom who spoke about revenue streams for the new stadium. The hotel was removed from scope after the hotel chain involved backed out. There will be a 1000 seat function room that will be able to cater for any number of events. Christmas events/parties can real money spinner.